2/3 Grange Road Leumeah
NSW 2560
Mon-Fri
07:00 - 17:00
(02) 4625 5911 / (02) 4625 5411
info@westform.com.au

The Sussex St pedestrian bridge

Project Detail

The Sussex St pedestrian bridge was part of the Wynyard Walk Tunnel project built by Thiess.

The tunnel and bridge provide access for pedestrians from Wynyard station directly to the Barangaroo site without crossing any roads.

The project consists of an extensive amount of off-form concrete provided by the class 2 formwork supplied by Westform.